How much wastage should I add?
10% is a normal starting point. Use less for tidy formwork and more for rough ground, uneven excavation or over-dig.
Typical metro prices in Australia. Confirm with your local supplier before ordering.
Concrete is sold by volume in m³. Measure the space, work out its volume, add wastage, then convert to individual bags or a premix order.
Wastage: sites lose concrete to spillage and uneven ground. 10% is standard; raise it for rough ground, lower it for tidy formwork.
Bags or premix: a 20 kg bag yields ≈ 0.0098 m³ (~102 bags/m³). Premix sells in 0.1 m³ steps; below 0.5 m³ bags usually avoid short-load fees.
Round pads (water tank bases, hot tub pads, circular landings) are flat cylinders: π × radius² × thickness. Enter diameter and thickness in millimetres; a 2.4 m tank pad at 100 mm is about 0.45 m³.
Tank pads carry real load: check your tank supplier's minimum thickness and mesh requirements. SlabSet estimates mesh sheets and the circular formwork edge length for you.
10% is a normal starting point. Use less for tidy formwork and more for rough ground, uneven excavation or over-dig.
Ready-mix is cheaper per cubic metre, but delivery and short-load fees make small deliveries poor value: suppliers charge extra below about 0.5 m³. Bags cost more per m³ but scale down to any size. The switchover is roughly 0.5 m³: below it, order bags; above it, book the truck.
No. Use SlabSet for estimating, then confirm quantities, grade and reinforcement before ordering.
Estimates only. Confirm quantities and prices with your supplier.